Heads-up: This is an older build. The series ends with the bow in raw wood; the lacquer finish, final string, and shooting happened off camera.
What I do in this part
The glue-up comes off the form. I unwrap it, clean up the squeeze-out, and add the sapele-and-Ipe riser. Then I rasp the fades and make the first tillering pull.
Tools & materials
- The glued-up bow from part 4.
- Sapele and Ipe for the riser.
- Five-minute epoxy.
- Rasp.
- Tillering setup.
Step by step
- Unwrap the cured glue-up.
- Clean away the glue squeeze-out.
- Glue on the sapele-and-Ipe riser with five-minute epoxy.
- Rasp the fades to shape.
- Put the bow on the tillering setup for its first pull.
Tips
- The backing glue-up and the riser use different adhesives in this build. Don’t confuse the five-minute epoxy here with the Unibond used on the form.
- This is the first tillering pull, not the finished draw-weight result. The next part takes the bow further.
Up next: Part 6, horn tips and tillering.
